Engineering Drawing

In the name of ALLAH who is the most beneficient and merciful
                   MACHINE/ENGIINEERING DRAWING COURSE
Jobs    Date         Title
  1. 21-01-2008 LINE AND ALPHABETS
  2. 28-01-208 GEOMETRICAL DRAWING(Line cutting,  joining by 45, ellipse, ellipse by 30)
  3. 11-02-2008 DEVELOPMENT OF BOX
  4. 25-02-2008 DEVELOPMENT OF CONE
  5. 03-03-2008 NATIONAL FLAG

(MIDTERM EXAM 8-16/03/08 MD PAPER 10/3/08 2HRS DRAWING: DEVELOPMENT OF CONE)

  1. 17-03-2008 ISOMETRIC VIEW AND PROJECTION METHOD(1ST AND 3RD)
  2. 31-03-2008 MACHINED BLOCK
  3. 21-04-2008 FREE HAND DRAWING
  4. 28-04-2008 TOOLS HOLDER


(1ST TERM EXAM 15-29/05/08 MD PAPER 26/5/08 4HRS DRAWING: TOOL HOLDER OR ISOMETRIC VIEW+SECTIONING QUIZ)

  1. 14-07-2008 SCREW FASTENING
  2. 21-07-2008 C.I.VEE BLOCK
  3. 28-07-2008 ANCHOR BLOCK
  4. 11-07-2008 GEAR BRACKET

(MIDTERM EXAM 25-06/07/08 MD PAPER 01/07/08 DRAWING: GEAR BRAKET)

  1. 08-09-2008 SECTIONING EXERCISE
  2. 11-09-2008 FUEL CONTROL LEVER
  3. 13-10-2008 CYCLINDER RELIEF VALVE
  4. 27-10-2008 GUIDE BRACKET(QUIZ)

 (2ND TERM EXAM 10-22/11/08 MD PAPER 17/11/08 4HRS DRAWING: GUIDE BRACKETS OR CYCLINDER RELIEF VALVE)

  1. 20-01-2009 BILGE SUCTION STRAINER VALVE (1:2 MM)
  2. 26-01-2009 CRANE HOOK
  3. 09-02-2009 CONTROL VALVE (2:1 MM)


(MIDTERM EXAM MD PAPER DRAWING: FUEL VALVE ASSEMBLY FRONT VIEW ONLY)


  1. 30-03-2009 PARALLEL SLIDE STOP VALVE
  2. 13-04-2009 ROCKING ARM ASSEMBLY
  3. 04-05-2009 MACHINE VISE
(3RD TERM EXAM 18-30/05/09 MD PAPER 06/05/08 4HRS DRAWING: TWO QUIZES BEFORE PARALLEL SLIDE STOP VALVE OR  MACHINE VISE ASSEMBLY)


  1. 06-07-2009 STARTING AIR PILOT VALVE (2:1 MM) Pg.51
  2. 20-07-2009 AUTOMATIC VALVE (1:1 MM) Pg. 53
  3. 03-08-2009 STARTING AIR VALVE (1:1 MM) Pg. 55
  4. 17-08-2009 GEAR PUMP Pg. 84


(MIDTERM EXAM MD PAPER 31-08-09 2HRS DRAWING: PARTS OF AUTOMATIC VALVE 2 OUT OF 4 (FV+PLAN) MATERIAL LIST+DIM.)

  1. 29-09-2009 DOXFORD FUEL PUMP(2:1MM)
  2. 05-10-2009 FUEL VALVE/INJECTOR (1:1 MM) Pg. 91


(4TH TERM EXAM 12-25/11/09 MD PAPER 02/11/09 4HRS EXPECTED DRAWING: DOXFORD FUEL PUMP+ GEAR PUMP)

WRITTEN BY S/C ZEESHAN AHMED (A/C 2988)
INSTRUCTOR: ENGINEER DASTAGIR KHAN SAHAB
DATE: 09/10/2009
TIME: 10:05:00 AM